Survey Aspects of Hinkley Point Construction
Add to calThe Chapel Theatre, Penryn Campus
The speaker is Mr James Rolland, Balfour Beatty
James' discussion will cover the role of survey in the Balfour Beatty HPC tunnels project:
How survey has been utilised during the construction of a the HPC tunnels and associated works
• Understanding where we are
• Importance of stable control
• Selection of equipment and software
• Insuring that checks and balances are carried out
• The sheer variety of work an engineering surveyor is involved with through the project