SUMMARY:Survey Aspects of Hinkley Point Construction
DESCRIPTION:The speaker is Mr James Rolland, Balfour Beatty\n
 \n
 James' discussion will cover the role of survey in the Balfour Beatty HPC tunnels project: \n
 \n
 How survey has been utilised during the construction of a the HPC tunnels and associated works\n
 \n
 •	Understanding where we are\n
 \n
 •	Importance of stable control\n
 \n
 •	Selection of equipment and software\n
 \n
 •	Insuring that checks and balances are carried out\n
 \n
 •	The sheer variety of work an engineering surveyor is involved with through the project